Malaysia Real Estate · Find, Compare, Decide — One Platform

Compare › R&F Princess Cove Phase 2 vs R&F Princess Cove Phase 3

R&F Princess Cove Phase 2 vs R&F Princess Cove Phase 3

Short answer

The lowest published price at R&F Princess Cove Phase 2 is RM690,000; R&F Princess Cove Phase 3 opens at RM430,000. R&F Princess Cove Phase 2 tops out at 1,471 sq ft, while R&F Princess Cove Phase 3 reaches 3,979 sq ft. The straight-line gap between them is about 0.4 km. R&F Princess Cove Phase 2 is completed; R&F Princess Cove Phase 3 is completing 2029.

For the latest price list and available units, WhatsApp +60 10-827 8932.

Full details for each project (prices, floor plans, car parks): R&F Princess Cove Phase 2 · R&F Princess Cove Phase 3

Numbers update together with each project page. Checked on 22 October 2026.

Compared row by row

R&F Princess Cove Phase 2R&F Princess Cove Phase 3
DeveloperR&F Development Sdn BhdR&F Development Sdn Bhd
AreaJohorJohor
Starting priceRM690,000RM430,000
Per sq ft (smallest unit)about RM1,474about RM1,374
Sizes468 – 1,471 sq ft313 – 3,979 sq ft
BedroomsStudio-4Studio-5
CompletionCompleted 2024Completing 2029
Units3,7244,385
MaintenanceRM0.42 psfRM0.3 psf
Roughly each month (smallest unit)about RM3,140about RM1,930
TenureFreeholdFreehold

Starting prices are gross and change with unit and floor. "Roughly each month" is the smallest unit with a 90% loan over 35 years at 4.5% a year, plus the published maintenance rate — an illustration, not a quote. Distances are straight-line.

Making the choice

R&F Princess Cove Phase 2 suits you if

  • You would rather buy something already built.

R&F Princess Cove Phase 3 suits you if

  • A lower starting price matters most (from RM430,000).
  • You want room to grow (layouts up to 3,979 sq ft).
  • Lower running costs matter (RM0.3 psf maintenance).

Getting around and other facts

Both are listed under Johor. R&F Princess Cove Phase 2 is freehold and R&F Princess Cove Phase 3 is freehold. For foreign buyers, either one needs State Authority approval in Johor: the unit must be priced at RM1,000,000 or more, or, below that, be a serviced apartment or SOHO bought from the developer (not on a resale) and approved by the State Authority, with a levy of at least RM50,000.

The two developments

Both come from R&F Development Sdn Bhd, so the difference is the product, not the builder. R&F Princess Cove Phase 3 is the larger development, with 4,385 units against 3,724 at R&F Princess Cove Phase 2. Fewer units usually means fewer neighbours sharing lifts and facilities; more units spread the shared costs over more owners. R&F Princess Cove Phase 2 offers Studio-4 bedrooms and R&F Princess Cove Phase 3 offers Studio-5.

Read more

R&F Princess Cove Phase 2: project pageR&F Princess Cove Phase 3: project page

Related comparisons

Amberwood Resort Residences vs R&F Princess Cove Phase 3Causewayz Square Axis vs R&F Princess Cove Phase 2Causewayz Square Axis vs R&F Princess Cove Phase 3Causewayz Square Brixton vs R&F Princess Cove Phase 2Causewayz Square Brixton vs R&F Princess Cove Phase 3Causewayz Square Dover vs R&F Princess Cove Phase 2Causewayz Square Dover vs R&F Princess Cove Phase 3Celestz vs R&F Princess Cove Phase 2

Quick questions

Which costs less to get into, R&F Princess Cove Phase 2 or R&F Princess Cove Phase 3?

The lowest published price at R&F Princess Cove Phase 2 is RM690,000; R&F Princess Cove Phase 3 opens at RM430,000. Measured per sq ft on the smallest units, that is about RM1,374 versus RM1,474.

Which is completed sooner?

R&F Princess Cove Phase 2 is completed; R&F Princess Cove Phase 3 is completing 2029.

How do the maintenance rates compare?

On service charges, R&F Princess Cove Phase 2 is set at RM0.42 psf and R&F Princess Cove Phase 3 at RM0.3 psf.

Are R&F Princess Cove Phase 2 and R&F Princess Cove Phase 3 close to each other?

About 0.4 km in a straight line.