Compare › Causewayz Square Dover vs R&F Princess Cove Phase 2
Causewayz Square Dover vs R&F Princess Cove Phase 2
In brief
Measured in a straight line, about 0.6 km separates them. Budget first: R&F Princess Cove Phase 2 begins at RM690,000 and Causewayz Square Dover at RM727,500. R&F Princess Cove Phase 2 is already built, while Causewayz Square Dover is completing 2030. For floor area, the biggest layout at R&F Princess Cove Phase 2 is 1,471 sq ft, compared with 850 at Causewayz Square Dover.
For the latest price list and available units, WhatsApp +60 10-827 8932.
Full details for each project (prices, floor plans, car parks): Causewayz Square Dover · R&F Princess Cove Phase 2
Numbers update together with each project page. Checked on 22 October 2026.
Head to head
| Causewayz Square Dover | R&F Princess Cove Phase 2 | |
|---|---|---|
| Developer | EXSIM LUMBA KUDA SDN BHD | R&F Development Sdn Bhd |
| Area | Johor | Johor |
| Starting price | RM727,500 | RM690,000 |
| Per sq ft (smallest unit) | about RM1,535 | about RM1,474 |
| Sizes | 474 – 850 sq ft | 468 – 1,471 sq ft |
| Bedrooms | 1-3 | Studio-4 |
| Completion | Completing 2030 | Completed 2024 |
| Units | 1,527 | 3,724 |
| Maintenance | RM0.36 psf | RM0.42 psf |
| Roughly each month (smallest unit) | about RM3,270 | about RM3,140 |
| Tenure | Freehold | Freehold |
Distances in this table are straight-line. Starting prices are gross and move with unit type and floor. For "roughly each month" we take the smallest unit, a 90% loan over 35 years at 4.5% a year, and add the published maintenance rate: a rough guide, not a quote.
Builder and size
R&F Princess Cove Phase 2 comes from R&F Development Sdn Bhd, while Causewayz Square Dover is a EXSIM LUMBA KUDA SDN BHD project. R&F Princess Cove Phase 2 is the larger development, with 3,724 units against 1,527 at Causewayz Square Dover. Fewer units usually means fewer neighbours sharing lifts and facilities; more units spread the shared costs over more owners. Bedroom range: 1-3 at Causewayz Square Dover, Studio-4 at R&F Princess Cove Phase 2.
Location, tenure and buying from abroad
They share an area: Johor. Tenure: Causewayz Square Dover is freehold; R&F Princess Cove Phase 2 is freehold. For foreign buyers, either one needs State Authority approval in Johor: the unit must be priced at RM1,000,000 or more, or, below that, be a serviced apartment or SOHO bought from the developer (not on a resale) and approved by the State Authority, with a levy of at least RM50,000.
Which suits whom
Causewayz Square Dover suits you if
- You prefer a lighter maintenance bill (RM0.36 psf).
R&F Princess Cove Phase 2 suits you if
- Your budget sits nearer RM690,000.
- You do not want to wait for construction.
- You need a larger unit (up to 1,471 sq ft).
Read more
Causewayz Square Dover: project pageR&F Princess Cove Phase 2: project page
Related comparisons
Aethera Residences vs Causewayz Square DoverArden Serviced Residence vs Causewayz Square DoverCausewayz Square Axis vs Causewayz Square DoverCausewayz Square Axis vs R&F Princess Cove Phase 2Causewayz Square Brixton vs Causewayz Square DoverCausewayz Square Brixton vs R&F Princess Cove Phase 2Causewayz Square Dover vs CelestzCausewayz Square Dover vs M Grand Minori
Buyers also ask
Which costs less to get into, Causewayz Square Dover or R&F Princess Cove Phase 2?
Budget first: R&F Princess Cove Phase 2 begins at RM690,000 and Causewayz Square Dover at RM727,500. Measured per sq ft on the smallest units, that is about RM1,474 versus RM1,535.
How close are Causewayz Square Dover and R&F Princess Cove Phase 2?
Roughly 0.6 km, measured in a straight line.
How do the maintenance rates compare?
R&F Princess Cove Phase 2 charges RM0.42 psf for maintenance; Causewayz Square Dover charges RM0.36 psf.
Which one is ready first?
R&F Princess Cove Phase 2 is already built, while Causewayz Square Dover is completing 2030.