Compare › Causewayz Square Dover vs Celestz
Causewayz Square Dover vs Celestz
Summary
Celestz starts lower, at RM543,800 against RM727,500 at Causewayz Square Dover. Celestz is the later one (completing Q1 2031); Causewayz Square Dover is completing 2030. If you need space, Celestz goes up to 915 sq ft against 850 at Causewayz Square Dover. In a straight line the two sit about 3.1 km from each other.
For the latest price list and available units, WhatsApp +60 10-827 8932.
Full details for each project (prices, floor plans, car parks): Causewayz Square Dover · Celestz
Numbers update together with each project page. Checked on 22 October 2026.
Side by side
| Causewayz Square Dover | Celestz | |
|---|---|---|
| Developer | EXSIM LUMBA KUDA SDN BHD | EXSIM KEBUN TEH SDN BHD |
| Area | Johor | Johor |
| Starting price | RM727,500 | RM543,800 |
| Per sq ft (smallest unit) | about RM1,535 | about RM936 |
| Sizes | 474 – 850 sq ft | 581 – 915 sq ft |
| Bedrooms | 1-3 | 1+1-3 |
| Completion | Completing 2030 | Completing Q1 2031 |
| Units | 1,527 | 735 |
| Maintenance | RM0.36 psf | RM0.51 psf |
| Roughly each month (smallest unit) | about RM3,270 | about RM2,610 |
| Tenure | Freehold | Leasehold |
Prices shown are gross starting prices; the actual figure depends on the unit and floor. The monthly row assumes the smallest unit, a 90% loan, 35 years and 4.5% a year, plus the published maintenance rate. It is an illustration only, not a quote. All distances are straight-line.
Which one fits you
Pick Causewayz Square Dover if
- You want the earlier handover (completing 2030).
- You want the lower monthly maintenance (RM0.36 psf).
Pick Celestz if
- Your budget sits nearer RM543,800.
- Floor area comes first (up to 915 sq ft).
Where they sit
Both are listed under Johor. Causewayz Square Dover is freehold and Celestz is leasehold. Buying from abroad: a foreign purchase in Johor needs State Authority approval and a unit priced at RM1,000,000 or more; below that line Johor allows only a commercial-title serviced apartment or SOHO bought from the developer (not on a resale), with State Authority approval and a levy of at least RM50,000.
Who builds it, and how big
The developers differ: EXSIM LUMBA KUDA SDN BHD for Causewayz Square Dover, EXSIM KEBUN TEH SDN BHD for Celestz. Unit count: 1,527 at Causewayz Square Dover, 735 at Celestz. A smaller block tends to feel more private; a bigger one usually carries a longer facility list. Bedroom range: 1-3 at Causewayz Square Dover, 1+1-3 at Celestz.
Full details
Causewayz Square Dover: project pageCelestz: project page
Other comparisons
Aethera Residences vs Causewayz Square DoverAmberwood Resort Residences vs CelestzArden Serviced Residence vs Causewayz Square DoverArden Serviced Residence vs CelestzCausewayz Square Axis vs Causewayz Square DoverCausewayz Square Brixton vs Causewayz Square DoverCausewayz Square Brixton vs CelestzCausewayz Square Dover vs M Grand Minori
Common questions
Does Causewayz Square Dover or Celestz have the lower starting price?
Celestz starts lower, at RM543,800 against RM727,500 at Causewayz Square Dover. Measured per sq ft on the smallest units, that is about RM936 versus RM1,535.
Which project completes earlier?
Celestz is the later one (completing Q1 2031); Causewayz Square Dover is completing 2030.
How do the maintenance rates compare?
Causewayz Square Dover has the lower maintenance rate, RM0.36 psf against RM0.51 at Celestz.
How far apart are Causewayz Square Dover and Celestz?
The straight-line distance is about 3.1 km.