NARA at Shorea Park is a freehold development in Puchong, Selangor, by Aspect Potential Sdn Bhd. 28 storeys, 709 units on 3.90 acres. Layouts run from 560 to 1,055 sq ft (1+1–4 bedrooms), from RM250,000.
Information last updated:
This page sets out what NARA at Shorea Park is, what it costs to buy and to hold, and what to check before you commit. Every figure comes from the developer’s published material; where something is not published, we say so rather than guess.
The facts
| Location | Lot 13992, Jalan Meranti Permai, Taman Meranti Permai, 47100 Puchong, Selangor |
|---|---|
| Developer | Aspect Potential Sdn Bhd |
| Tenure | Freehold · Commercial under HDA |
| Land size | 3.90 acres |
| Blocks and units | 709 units · 28 storeys |
| Unit mix | Type A 560 sq.ft. (1+1 Bedroom) · Type B 807 sq.ft. (2 Bedroom) · Type C 936 sq.ft. (3 Bedroom) · Type D 1,055 sq.ft. (4 Bedroom) |
| Units per floor | Tower A: 15, Tower B: 14 · 3 |
| Starting price | From RM250,000 |
| Maintenance fee | RM3.28 per share unit (including 10% sinking fund) |
| Car parks | Type A – 560sq.ft. (1 CP); Type B – 807sq.ft. (2 CP); Type C – 936sq.ft. (2 CP); Type C1 (GF) – 936sq.ft. + Terrace 291sq.ft (3 CP); Type C2 (L6) – 936sq.ft. + |
| Completion | Expected 2028 (developer’s stated date) |
Getting around Puchong
- Shopping and daily needs — IOI Mall, Puchong, DPULZE Shopping Centre, Tamarind Square, Cyberjaya, IOI Mall, Putrajaya.
- Schools and healthcare — SJK (C) Sin Ming, SK Pulau Meranti, SK Puchong Utama 2, KPMC Puchong Specialist Centre, Columbia Asia Hospital, Bandar Puteri.
Facilities
The developer lists Landscape area, Roof garden, Swimming pool, Kids pool, Gym area, Multipurpose hall (2 badminton courts, half basketball court), Private Function Room among the facilities.
What it costs to hold
Maintenance is listed at RM3.28 per share unit (including 10% sinking fund). On about RM3.28 per sq ft:
| Unit size | Estimated maintenance per month |
|---|---|
| 560 sq ft | about RM1,837 |
| 807 sq ft | about RM2,647 |
| 1,055 sq ft | about RM3,460 |
Size × the rate above. Actual billing may differ.
Compare
Monthly
Roughly what it costs each month
For the smallest unit (560 sq ft) at the starting price of RM250,000.
An illustration, not a quote. Banks' published reference home-loan rates ranged from about 4.1% to 5.2% in September 2026, and the margin and tenure you get depend on the bank and on you. Stamp duty on the loan agreement is 0.5% of your loan. Work it out for another unit →
Every Puchong project we track
We track 6 projects in Puchong, starting from RM250,000 (NARA at Shorea Park) up to RM664,000 (Avantro Residences). Unit sizes run from 550 to 1,389 sq ft. 6 are due between 2026 and 2028.
| Project | From | Per sq ft | Sizes | Status |
|---|---|---|---|---|
| NARA at Shorea Park (this page) | RM250,000 | about RM446 | 560–1,055 sq ft | Completing 2028 |
| Residensi Danau | RM270,000 | about RM477 | 566–999 sq ft | Completing 2027 |
| Anya at Shorea Park | RM504,000 | about RM900 | 560–1,389 sq ft | Completing 2026 |
| The Wyn Residences | RM516,700 | about RM738 | 700–850 sq ft | Completing 2027 |
| Trinity Rainfora | RM568,000 | about RM769 | 739–1,184 sq ft | Completing 2028 |
| Avantro Residences | RM664,000 | about RM1,207 | 550–1,206 sq ft | Completing 2028 |
Per sq ft is the starting price divided by the smallest unit — a rough guide, not a quoted rate.
What we like, and what to check
What we like
- No single standout on the numbers alone — judge it on location and layout.
What to check before you commit
- Still building — expected 2028. Dates are the developer’s expectation and can move; you may be paying rent and progress instalments together.
- Commercial title under HDA. Utilities and assessment are usually charged at commercial rates — confirm the figures.
- Maintenance above the list median. About RM3.28 psf against a median of RM0.35.
Who it suits
First-time buyers and investors who want a compact unit in Puchong.
Frequently asked questions
Is NARA at Shorea Park freehold?
Yes, NARA at Shorea Park is freehold.
How much does a unit at NARA at Shorea Park cost?
From RM250,000.
What sizes are available at NARA at Shorea Park?
From 560 to 1,055 sq ft, 1+1–4 bedrooms.
What is the maintenance fee at NARA at Shorea Park?
RM3.28 per share unit (including 10% sinking fund) — about RM1,837 a month for a 560 sq ft unit.
When will NARA at Shorea Park be completed?
The developer states 2028. Dates can move.
Does a unit come with a car park?
Type A – 560sq.ft. (1 CP); Type B – 807sq.ft. (2 CP); Type C – 936sq.ft. (2 CP); Type C1 (GF) – 936sq.ft. + Terrace 291sq.ft (3 CP); Type C2 (L6) – 936sq.ft. + Terrace 140sq.ft (3 CP); Type D – 1055sq.ft. (2 / 3 CP); Type D1 (GF) – 1055sq.ft. + Terrace 312sq.ft (3 CP); Type D2 (L6) – 1055sq.ft. + Terrace 140sq.ft (3 CP)
Read next
Want the layouts and current availability?
We can send the floor plans, check what is still open and arrange a viewing.