Malaysia Real Estate · Find, Compare, Decide — One Platform

Quick answer

Anya at Shorea Park is a freehold development in Puchong, Selangor, by Aspect Potential Sdn Bhd. 33 storeys, 750 units on 3.91 acres. Layouts run from 560 to 1,389 sq ft (1+1–4 bedrooms), from RM504,000.

Information last updated:

This page sets out what Anya at Shorea Park is, what it costs to buy and to hold, and what to check before you commit. Every figure comes from the developer’s published material; where something is not published, we say so rather than guess.

The facts

Location Lot 13992, Jalan Meranti Permai, Taman Meranti Permai, 47100 Puchong, Selangor
Developer Aspect Potential Sdn Bhd
Tenure Freehold · Commercial under HDA
Land size 3.91 acres
Blocks and units 750 units · 33 storeys
Unit mix Type C 1,195 sq.ft. (3 Bedroom) · Type D 1,389 sq.ft. (4 Bedroom) · Type A 560 sq.ft. (1+1 Bedroom) · Type B 915 sq.ft. (3 Bedroom)
Units per floor 10-13 · 2+1
Starting price From RM504,000
Maintenance fee 0.34
Car parks Type A: 1 Car Park, Type B (Lvl 1 – Lvl 33): 2 Car Parks, Type B (Lvl 31): 3 Car Parks, Type C ( Lvl 1 – Lvl 30): 2 Car Parks, Type C ( Lvl 7): 3 Car Parks, Typ
Completion Expected 2026 (developer’s stated date)

Getting around Puchong

  • Putrajaya Sentral Rail Hub.
  • Shopping and daily needs — Lotus’s Extra, Bukit Puchong, Aeon Big Puchong Utama, Hero Market Puchong Utama, IOI Mall, Puchong.
  • Schools and healthcare — SJK (C) Sin Ming, Taylor’s International School, SK Pulau Meranti, KPMC Puchong Specialist Centre, Columbia Asia Hospital, Bandar Puteri.

Facilities

The developer lists Roof top Garden, Swimming pool, Wading pool, Gym area, Multipurpose hall, Badminton courts, Private Function Room, Games Room among the facilities.

What it costs to hold

The developer has not published a maintenance rate in the material we hold. Ask for the current rate per square foot before you commit — it runs every month from handover.

Compare

Monthly

Roughly what it costs each month

For the smallest unit (560 sq ft) at the starting price of RM504,000.

Loan repayment
about RM2,150
90% loan, 35 years, 4.5% a year
Together
about RM2,150
before utilities and insurance

An illustration, not a quote. Banks' published reference home-loan rates ranged from about 4.1% to 5.2% in September 2026, and the margin and tenure you get depend on the bank and on you. Stamp duty on the loan agreement is 0.5% of your loan. Work it out for another unit →

Every Puchong project we track

We track 6 projects in Puchong, starting from RM250,000 (NARA at Shorea Park) up to RM664,000 (Avantro Residences). Unit sizes run from 550 to 1,389 sq ft. 6 are due between 2026 and 2028.

ProjectFromPer sq ftSizesStatus
NARA at Shorea ParkRM250,000about RM446560–1,055 sq ftCompleting 2028
Residensi DanauRM270,000about RM477566–999 sq ftCompleting 2027
Anya at Shorea Park (this page)RM504,000about RM900560–1,389 sq ftCompleting 2026
The Wyn ResidencesRM516,700about RM738700–850 sq ftCompleting 2027
Trinity RainforaRM568,000about RM769739–1,184 sq ftCompleting 2028
Avantro ResidencesRM664,000about RM1,207550–1,206 sq ftCompleting 2028

Per sq ft is the starting price divided by the smallest unit — a rough guide, not a quoted rate.

What we like, and what to check

What we like

  • Car parks included. Type A: 1 Car Park, Type B (Lvl 1 – Lvl 33): 2 Car Parks, Type B (Lvl 31): 3 Car Parks, Type C ( Lvl 1 – Lvl 3.

What to check before you commit

  • Still building — expected 2026. Dates are the developer’s expectation and can move; you may be paying rent and progress instalments together.
  • Commercial title under HDA. Utilities and assessment are usually charged at commercial rates — confirm the figures.

Who it suits

Both own-stay buyers and investors — the mix runs from compact to family-sized layouts in Puchong.

Frequently asked questions

Is Anya at Shorea Park freehold?

Yes, Anya at Shorea Park is freehold.

How much does a unit at Anya at Shorea Park cost?

From RM504,000.

What sizes are available at Anya at Shorea Park?

From 560 to 1,389 sq ft, 1+1–4 bedrooms.

What is the maintenance fee at Anya at Shorea Park?

0.34

When will Anya at Shorea Park be completed?

The developer states 2026. Dates can move.

Does a unit come with a car park?

Type A: 1 Car Park, Type B (Lvl 1 – Lvl 33): 2 Car Parks, Type B (Lvl 31): 3 Car Parks, Type C ( Lvl 1 – Lvl 30): 2 Car Parks, Type C ( Lvl 7): 3 Car Parks, Type D: 3 Car Parks (*Side by Side Car Park)

Read next

Every project on one map

Want the layouts and current availability?

We can send the floor plans, check what is still open and arrange a viewing.

WhatsApp usSee the project page

How we check these figures →

Leave a Reply

Your email address will not be published. Required fields are marked *